SECTION 1 – PURPOSE AND APPLICATION OF DESIGN GUIDELINES
1.1 Purpose of the Design Guidelines, Standards, and Requirements for Building on Residential, Commercial, Multi-Use, and Common Area Properties in Loreto Bay, known as the “Design Guidelines”
1.2 Applicability of the Design Guidelines, Compliance with Law and Building Codes, and Approvals
1.3 Guideline Reviews and Amendments
1.4 Disclaimer of Liability
SECTION 2 – BUILDING IN LORETO BAY
2.1 Building in Loreto Bay
2.2 Buildings within the Master Condominium - the Villages of Loreto Bay
2.3 The Courtyard House
2.4 The Importance of the Streetscape
2.5 Respectful Architecture
2.6 Building in a Sustainable Community
SECTION 3 – PROPERTY TYPES IN LORETO BAY
3.1 Village Home Properties
3.2 Custom Home Properties
3.3 Village and Custom Home Properties on Canal Lots
3.4 Multiple Unit, Mixed-Use, and Commercial Properties
3.5 Common Areas
SECTION 4 – SITE DESIGN
4.1 Lot Coverage
4.1.1 Main Floor – Village and Custom Homes
4.1.2 Second Floor
4.1.3 Third Floor
4.1.4 Viewing Decks Above the Third Floor
4.1.5 Post-construction Viewing Decks – Village and Custom Homes 4.1.6 Privacy and Overlook
4.2 Setbacks
4.2.1 Zero Setback Conditions at Common Property Lines
4.2.2 Street Facades
4.2.3 Beachfront Lot Lines
4.2.4 Golf Course Lots
4.2.5 Canal and Estuary Lots
4.3 Building Heights
4.3.1 Floor Levels
4.3.2 Stories – Village and Custom Homes
4.3.3 Second Floor Parapet Walls – Village and Custom Homes
4.3.4 Fences and Courtyard Walls
4.3.5 Mixed-Use Buildings
4.4 Landscaping
SECTION 5 – GENERAL ARCHITECTURAL DESIGN
5.1 Massing Criteria
5.2 Exterior Walls
5.2.1 Articulation of the Street Facade
5.2.2 Beachfront, Golf Course, Estuary, and Canal Facades
5.3 Roofs
5.3.1 Main Roof Types
5.3.2 Special Roof Forms
5.3.3 Overhangs
5.3.4 Shading Devices for Roof Terraces
5.4 Zaguan
5.5 Courtyards
5.6 Porches or Corredors
5.7 Balconies
5.8 Railings and Fences
5.8.1 Railings and Fences on Canal and Estuary Lots
5.9 Arcades
5.10 Columns
5.11 Arches
5.12 Doors, Windows, Hardware
5.12.1 Doors
5.12.2 Windows
5.12.3 Window Shading Devices
5.12.4 Window Screens, Grilles, and Shutters
5.12.5 Window Tinting
5.12.6 Exterior Storm Shutters
5.12.7 Door and Window Trim
5.12.8 Door and Window Hardware
5.12.9 Skylights
SECTION 6 – MATERIALS
6.1 Materials
6.2 Selection Criteria
6.3 Reduce Environmental Impacts
6.4 Indoor Environmental Quality
6.5 Types of Finish Materials
SECTION 7 – BUILDING SYSTEMS
7.1 Energy and Power
7.2 Passive Cooling and Ventilation
7.2.1 Passive Cooling
7.2.2 Passive Ventilation
7.2.3 Cooling and Ventilation Equipment
7.2.4 Electrical Power Allocation
7.3 Lighting
7.3.1 Natural Light
7.3.2 “Dark Sky”
7.3.3 Landscape Lighting
7.3.4 Outdoor Light Fixture Shielding and Source Requirements
7.3.5 Fully Shielded Fixtures
7.3.6 Light Trespass Standards
7.3.7 Other Requirements
7.4 Elevators
7.5 Communication Equipment, Antennas, Satellite Dishes, Telecom, and Other Electrical Equipment
7.6 Fireplaces and Fire Pits
SECTION 8 – COLOR SCHEME
8.1 Color Scheme Implementation and Approval
8.2 The Color Palette
8.3 Changing Exterior Color and Color Not on Approved Palette
SECTION 9 – DETAILED ARCHITECTURAL DESIGN
9.1 Architectural Decoration
9.2 Address Signs and Casa Name Plaques
SECTION 10 – LANDSCAPING FEATURES AND SITE MAINTENANCE
10.1 Pools and Water Features
10.2 View Corridors
10.3 Construction Sites
SECTION 11 – GUIDELINES FOR SIGNAGE
11.1 Goals for Signage
11.2 Application Requirements
11.3 Types of Signs
11.4 Design Standards
11.5 Sign Message and Language
11.6 Sign Illumination
11.7 Sign Maintenance
11.8 Sign Removal
SECTION 12 – DESIGN REVIEW PROCESS
12.1 Design Review Process
12.2 Minor Renovations
12.3 Major Renovations
12.4 Interior Modifications
12.5 Variances to Design Guidelines
12.6 Plan Submission
12.6.1 Application
12.6.2 Plan Submittals
12.6.3 Fees
12.7 Review Process and Timeline
12.7.1 Application Review
12.7.2 Decision Classifications
12.7.3 Review Periods
12.7.4 Notice of Decision
12.7.5 Compliance, Effects, and Limitations on Approval
12.7.6 Inspection and Compliance Review
12.7.7 Changes to Approved Designs
12.8 Non-Approved Work
12.9 Fines and Penalties
12.10 Appeal Process
12.10.1 Permitted Appeals
12.10.2 Appeal Procedures
12.10.3 Appeal Panel
12.10.4 Mediation
APPENDICES
Appendix 1: Design Review Process Fees and Penalties
Appendix 2: Color Palette
Appendix 3. Map of Loreto Bay
Appendix 4. Roof Tile Palette